Correct date format to configure

Due to lot of confusion of the given example I corrected it and added to both settings an verified working example with the valid datetime format. Verified in several tenants (kudos Maurice Delay how initially discovered it, Yinghua Zeng for testing and I tested as well).
This commit is contained in:
Oliver Kieselbach 2018-10-25 17:11:47 +02:00 committed by GitHub
parent c1d27fd6cb
commit 5df4a131f6
No known key found for this signature in database
GPG Key ID: 4AEE18F83AFDEB23

View File

@ -36,12 +36,14 @@ The following diagram shows the Reboot configuration service provider management
<p style="margin-left: 20px">The supported operation is Get.</p> <p style="margin-left: 20px">The supported operation is Get.</p>
<a href="" id="schedule-single"></a>**Schedule/Single** <a href="" id="schedule-single"></a>**Schedule/Single**
<p style="margin-left: 20px">This node will execute a reboot at a scheduled date and time. Setting a null (empty) date will delete the existing schedule. The date and time value is ISO8601, and both the date and time are required. For example: 2015-12-15T07:36:25Z</p> <p style="margin-left: 20px">This node will execute a reboot at a scheduled date and time. Setting a null (empty) date will delete the existing schedule. The date and time value is ISO8601, and both the date and time are required. </br>
Example to configure: 2018-10-25T18:00:00</p>
<p style="margin-left: 20px">The supported operations are Get, Add, Replace, and Delete.</p> <p style="margin-left: 20px">The supported operations are Get, Add, Replace, and Delete.</p>
<a href="" id="schedule-dailyrecurrent"></a>**Schedule/DailyRecurrent** <a href="" id="schedule-dailyrecurrent"></a>**Schedule/DailyRecurrent**
<p style="margin-left: 20px">This node will execute a reboot each day at a scheduled time starting at the configured starting time and date. Setting a null (empty) date will delete the existing schedule. The date and time value is ISO8601, and both the date and time are required. The CSP will return the date time in the following format: 2018-06-29T10:00:00+01:00. </p> <p style="margin-left: 20px">This node will execute a reboot each day at a scheduled time starting at the configured starting time and date. Setting a null (empty) date will delete the existing schedule. The date and time value is ISO8601, and both the date and time are required. The CSP will return the date time in the following format: 2018-06-29T10:00:00+01:00. </br>
Example to configure: 2018-10-25T18:00:00</p>
<p style="margin-left: 20px">The supported operations are Get, Add, Replace, and Delete.</p> <p style="margin-left: 20px">The supported operations are Get, Add, Replace, and Delete.</p>