windows-itpro-docs/browsers/enterprise-mode/verify-changes-production-enterprise-mode-portal.md
Liz Long dba1eea9cb Revert "msprod browsers"
This reverts commit 5e998bcfaeeda15e2499f09a98b36f2b45f354e5.
2022-10-27 10:41:51 -04:00

2.1 KiB

ms.localizationpriority, ms.mktglfcycl, ms.pagetype, description, author, ms.prod, title, ms.sitesec, ms.date, ms.reviewer, manager, ms.author
ms.localizationpriority ms.mktglfcycl ms.pagetype description author ms.prod title ms.sitesec ms.date ms.reviewer manager ms.author
low deploy appcompat Details about how the Requester makes sure that the change request update is accurate within the production environment using the Enterprise Mode Site List Portal. dansimp ie11 Verify the change request update in the production environment using the Enterprise Mode Site List Portal (Internet Explorer 11 for IT Pros) library 07/27/2017 dansimp dansimp

Verify the change request update in the production environment using the Enterprise Mode Site List Portal

Applies to:

  • Windows 10
  • Windows 8.1
  • Windows 7
  • Windows Server 2012 R2
  • Windows Server 2008 R2 with Service Pack 1 (SP1)

Verify and sign off on the update in the production environment

The Requester tests the changes in the production environment and then goes back into the Enterprise Mode Site List Portal, Production verification page to verify whether the testing was successful.

To verify the changes and sign off

  • On the Production verification page, the Requester clicks Successful, optionally includes any attachments (only .jpeg, .png, .jpg and .txt files are allowed) to support the testing results, optionally includes a description of the change, and then clicks Sign off.

    The Requester, Approver group, and Administrator group all get an email, stating that the change request has been signed off.

To rollback production changes

  1. On the Production verification page, the Requester clicks Failed and optionally includes any attachments (only .jpeg, .png, .jpg and .txt files are allowed) to support the testing results.

  2. Add a description about the issue into the Change description box, and then click Send failure details.

    The info is sent to the Administrators.

  3. The Requester clicks Roll back to roll back the changes in the production environment.

    After the Requester rolls back the changes, the request is automatically handled in the production and pre-production environment site lists.